Bitmain Antspace HK3 Liquid Hydro Cooling Container

Short Description:

Model:Antspace

Specifications:1030KW

Miner Capacity:210 units -S19 Hyd. Series miner

Crypto Algorithm: Kadena (Blake2s)

Payment:Alibaba PayPal,VISA,MasterCard,Western Union,T/T,Other,L/C,D/P,D/A


  • For the latest offers, visit: Telegram Channel
  • Product Detail

    Product Tags

    Product Description

    Built with efficiency and hotter climates in mind, the BITMAIN ANTSPACE HK3 (known as model designation Antbox H3 V2 internally) has a maximum capacity of 210 units of Antminer S19 Pro+ Hydro with total consumption of a little over 1MW. The minimum ASIC quantity to compliment the order will be 195 S19 Hydro units per container. The AntSpace HK3 is sold as a two-piece stackable set– a cooling tower and mining container. Refer to the brochure in the downloads tab for technical details. Unlike Bitmain, we provide DDP (delivery duty paid) service for the ASIC miners, but not the container. THE UNIT IS NOW FREE WHEN PURCHASING MOQ OF 195 S19 HYDRO.

     Price for AntSpace does not include door-to-door ocean freight service. Freight costs will be quoted at time of loading as shipping costs vary weekly, and by location. ExWorks / FOB incoterms available. 1 year manufacturer warranty included. S19 Pro+ Hydro warranty void if used outside the AntSpace HK3 system.

    Product Video

    Product Parament

    Model ANTSPACE HK3
    Dimensions (L*W*H) (mm) 6058*2438*2896
    Miner Capacity 210 units -S19 Hyd. Series miner
    Container Certification China Classification Society Certification
    Safety Certification North America/StandardsNFPA 79:2021UL 508A:2018 R8.21
    CSA C22.2 No. 14-18ANSI/ISO 12100:2012
    EU/StandardsEN ISO 12100EN 60204-1
    Operating Power(kW) 1047~1050
    PUE(Power Usage Effectiveness) 1.022(Excluding cooling tower)/1.036(Including cooling tower)
    Input Voltage and Frequency 415V±5% 60Hz(North America)
    400V±5% 50Hz(EUMiddle East)
    Shipping Weight(T) 8
    Operating Weight (T) 12
     Main Switch of Power Distribution Cabinets(A) 1200(North America)
    1250(EUMiddle East)
    Rated Current(A) 952
    Standard Power(kW) 1049
    Maximum Power(kW)  1050
    Rated Current per Miner(A)  10
    Connection Interface(Cooling Tower) DN125(GB/T 9119-2010 PN16 DN125)
    Connection Interface(Plate Heat Exchage Interface) DN100(GB/T 9119-2010 PN16 DN100)
    Flow Rate(m³/h) 85
    Quantity of ANTSPACE powered by one 2500kVA Transformer 2

    Environmental Requirements

    1

    Cooling tower is required to be placed on flat ground, horizontal degree (±1 degree).

    2

    The ground surfaced is required to be hardened and stable, able to withstand at least 14-ton load

    3

    A 10-ton crane is needed for unloading ANTSPACE and cooling tower.

    4

    Add-on items such as stairs, transformers, cables, bridge racks and cable distribution boxes are not included in the delivery of ANTSPACE. BITMAIN team can provide design suggestions if needed.

    5

    Client needs to confirm the opening directon of container and it needs to face air-intake. Door on left is current design by defult.

    6

    Keep at least 2 meters of air in-take space around the cooling tower.

    7

    Altitude: ≤3000m. If the altitude is higher than 1000-meter, transformer and switch should be derated, the total power of ANTSPACE must be decreased by 1% for each elevation increment of 100 meters.

    8

    Operating temperature: -25°C to 40°C. Operating humidity: 10%RH to 90%RH. When the initial coolant temperature is below 20 °C, the internal circulation should be turned on to heat up the coolant to above 20 °C before starting the mining machine.

    9

    When the ambient temperature is below 5 ℃, the cooling tower can be switched to cold-dry mode.

    10

    Choose pure water or suitable antifreeze as coolant based on local climate conditions.

    11

    The suitable ambient temperature for ANTSPACE does not represent the suitable ambient temperature for mining machine.

    Package

    PACKAGE

    How to Complete The Order

    ORDER PROCESS

     Payment Methods

    PAYMENT TERMS

     

    Cooperation Express

    sd

    Q: When will we ship after payment?
    A: In order to ensure that the products we ship are in good condition. Issued approximately 3-5 days after receiving your payment.

    Q: What if the product is damaged during transportation?
    A: We will use a more robust package when shipping to avoid damage to the goods, and we can purchase transportation insurance in advance to reduce the loss of in the transport. although this problem is not common.

    Q: What payment methods do we support?
    A: We support bank transfer, wire transfer, Western Union, BTC, third-party guarantee and Paypal.

    Q: What should I do if there is a problem after receiving the products?
    A: We have established good relationships with maintenance departments in many countries/regions in the world. For example, Venezuela, Iran, etc. If you have any questions within 3 days after receiving the goods, you can apply for after-sales service on the "My Order" page.

    Q: Which express we support?
    A: We will choose the cheapest and fastest transportation method for you. And we support DHL, UPS, TNT, Fedex, BRE, and also have express delivery services, such as Russia, the United States, Kuwait, etc.

    Purchase Guide

    1. Prices on the website are for reference only, and are subject to the following order prices. If you need to purchase, please contact us to place an order and ask for a quote for assistance.
    2. All pictures and parameters are for reference only, and subject to the final delivery version.
    3. There is any doubts just feel free to contact us, We will be 24 hours online service (Click the button for live chat).


  • Previous:
  • Next:

  • Related Products